daq:how_to_power_up_the_daq
- Turn on the master exploder
- go to the CSS-PANDA low voltage control
- turn on channel 4 with 12 V
- the current should be about 0.5 A
- Turn on the FEBEX, slave exploder and
lipc-1
- go the the socket web interface http://192.168.10.8
- turn on the FEBEX fans under
Feb fans
- turn on
FEBEX
- wait some seconds
- turn on
LIPC-1
- Wait about 90 seconds for the pc to boot before you proceed with setting up the DAQ
daq/how_to_power_up_the_daq.txt · Last modified: 2022/01/14 18:44 by 127.0.0.1