User Tools

Site Tools


beamtimes:2022_apr

This is an old revision of the document!


Beamtime Jan 2022

Nitrogen

Please check the nitrogen pressure once per shift! Approximately ???? bar per day are used.

The bottles are placed in the detector lab in the A1 ground floor.

Pres /bar date

General Overview

Beam test 20/04 – 26/04/2022:

  • 20. and 21.: MAMI accelerator tuning
  • 22. and 23.: Detector commisioning
  • 24. - 26.: Measurements
  • 26. evening: put sensible parts to save place
beamtimes/2022_apr.1649418678.txt.gz · Last modified: 2022/04/08 11:51 by himuser

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki