User Tools

Site Tools


beamtimes:2022_apr

This is an old revision of the document!


Beamtime Jan 2022

Nitrogen

Please check the nitrogen pressure twice a day! Approximately ???? bar per day are used.

The bottles are placed in the detector lab in the A1 ground floor.

Pres /bar date

General Overview

Beam test 20/04 – 26/04/2022:

  • 20. and 21.: MAMI accelerator tuning
  • 22. and 23.: Detector commisioning
  • 24. - 26.: measurements
  • 26. evening: put sensible parts to save place
beamtimes/2022_apr.1649417221.txt.gz · Last modified: 2022/04/08 11:27 by himuser

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki