Slow Control
Calorimeter
- Stecker
- Low Voltage
- High Voltage
- APFEL Control
- Light Pulser 1 (Mainz)
- Light Pulser 2 (LED Matrix)
- Temperature Readout
- Chiller???
Scintillator
High Voltage
start server on VME PC:
- got to VME-PC
$ ssh 192. 168.10.11
$ cd ~/GEM_Proto/HV/WebHV/
$ ./SYMBhv -c HVconfig_CFD.conf
open a new terminal and start the GUI on hadanapc5:
$ cd ~/VME/HV_CAEN/build-HVgui
$ ./HVgui
Now the GUI window opens. Channel 2 is used for the scintillator. Set the trip current to 30 muA and set the max Voltage to 1500 V. Turn up the voltage to 1300 V, now you should be able to see signals.
QDC
Scaler