User Tools

Site Tools


beamtimes:2022_apr:slow_control

This is an old revision of the document!


Slow Control

Calorimeter

  • Stecker
  • Low Voltage
  • High Voltage
  • APFEL Control
  • Light Pulser 1 (Mainz)
  • Light Pulser 2 (LED Matrix)
  • Temperature Readout
  • Chiller???

Scintillator

High Voltage

start server on VME PC:

  • got to VME-PC $ ssh 192. 168.10.11
  • $ cd ~/GEM_Proto/HV/WebHV/
  • $ ./SYMBhv -c HVconfig_CFD.conf

start GUI on hadanapc5:

  • $ cd ~/VME/HV_CAEN/build-HVgui
  • $ ./HVgui

Now the GUI window opens. Channel 2 is used for the scintillator. Set the trip current to 30 muA and set the max Voltage to 1500 V. Turn up the voltage to 1300 V, now you should be able to see signals.

QDC
Scaler
beamtimes/2022_apr/slow_control.1649419938.txt.gz · Last modified: 2022/04/08 12:12 by himuser

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki