beamtimes:2022_apr:a1
This is an old revision of the document!
Table of Contents
A1 control
When changing the target or taking pictures, make sure that the beam is turned off. Talk to the operateur to confirm.
Change Target
Take Pictures For Logging
Spec A
Spec B
beamtimes/2022_apr/a1.1650456369.txt.gz · Last modified: 2022/04/20 12:06 by himuser