1) check that HV on ISEG is ramped up to 500V; IF NOT, RAMP UP (SEE BELOW)
2) ramp up detector HV:
in workspace “Apfel+HV” find terminal Ramp HV:
agmaas@prima-daq1:~/repo/hv_control$ python3 ramp_hv.py -f /data/data_raid/prima_feb_25/hv_scan_6 -x /home/agmaas/Data/beamtime_Feb2025/hv/exclude_channels.dat -id all -off -0
1) ramp down HV on APDs
agmaas@prima-daq1:~/repo/hv_control$ python3 ramp_hv.py -val 0 -x /home/agmaas/Data/beamtime_Feb2025/hv/exclude_channels.dat -id all
if the last line of the output is a 1 repeatedly, you can stop the terminal “Crt+c”
————————————————————————————————————————————————–
1) check that detector hv is off
2) use web interface (tab should be open in firefox already)
IF NOT: http://hadanapc2:8081/dcs/iseg-hv
3) for modules 5 to 9, click checkbox “select all” and click “switch all <on/off>”
1) check that detector hv is off
2) use web interface (tab should be open in firefox already)
IF NOT: http://hadanapc2:8081/dcs/iseg-hv
3) for modules 5 to 9, click checkbox “select all” and click “switch all <on/off>”