==== How to ramp the high voltage == === Ramp detector HV === == ramp Detector HV up: == 1) check that HV on ISEG is ramped up to 500V; IF NOT, RAMP UP (SEE BELOW) 2) ramp up detector HV: in workspace "Apfel+HV" find terminal Ramp HV: agmaas@prima-daq1:~/repo/hv_control$ python3 ramp_hv.py -f /data/data_raid/prima_may_25/hv_scan_2/ -x /home/agmaas/Data/beamtime_May2025/hv/exclude_channels.dat -id all -off 0 2b) if half of submodule 32 needs to be ramped down, use the alternative exclude file: agmaas@prima-daq1:~/repo/hv_control$ python3 ramp_hv.py -f /data/data_raid/prima_may_25/hv_scan_2/ -x /home/agmaas/Data/beamtime_May2025/hv/exclude_channels_sub32high_off.dat -id all -off 0 == ramp Detector HV down: == 1) ramp down HV on APDs agmaas@prima-daq1:~/repo/hv_control$ python3 ramp_hv.py -val 0 -id all if the last line of the output is a 1 repeatedly, you can stop the terminal "Crt+c" **--------------------------------------------------------------------------------------------------------------------------------------------------** === Ramp ISEG HV === == ramp pre-HV (ISEG) up: == 1) **check that detector hv is off** 2) use web interface (tab should be open in firefox already) IF NOT: http://hadanapc2:8081/dcs/iseg-hv 3) for modules 5 to 9, click checkbox "select all" and click "switch all " == ramp pre-HV (ISEG) down: == 1) **check that detector hv is off** 2) use web interface (tab should be open in firefox already) IF NOT: http://hadanapc2:8081/dcs/iseg-hv 3) for modules 5 to 9, click checkbox "select all" and click "switch all " {{:prima_control:screenshot_2025-02-26_13-08-57.png?600|}}