====== Timeplan for Setup in the A1-Hall ====== | ====== Timeplan for Setup in the A1-Hall ====== | ||
- | The goal is to have a fully equipped and running detector in A1 at October | + | The goal is to have a fully equipped and running detector in A1 at October |
+ | === **First commissioning beam time: 16.10.-27.10.** === | ||
To do in HIM hall: | To do in HIM hall: | ||
* [x] Cable the detector (P, C, S, Aj) (30.08.) | * [x] Cable the detector (P, C, S, Aj) (30.08.) | ||
* [x] detector submodule position measurement (P+C+S) (06.09.) | * [x] detector submodule position measurement (P+C+S) (06.09.) | ||
- | * [ ] leakage test, humidity | + | * [x] leakage test, test at room temperature (J+P) (06.09.) |
- | * [ ] splitter board test (L) (06.09.) | + | * [x] splitter board test (L) (06.09.) |
- | * [ ] VLAN commissioning | + | * [x] humidity test (J+P) (17.09.) |
+ | * [x] cool the detector (18.09.) | ||
+ | * [x] cable the rack (O+L) (18.09.) | ||
* [x] assemble SADC setup (O+A) (13.09.) | * [x] assemble SADC setup (O+A) (13.09.) | ||
- | * [ ] read out whole detector at once (13.09.) | + | * [x] HV control (18.09.) |
- | * [ ] cosmic measurement 200MeV; warm or cold? (13.09.) | + | * [x] read out commercial sensors with keysight (20.09.) |
- | * [ ] Get cabled detector ready for movement (16.09.) | + | * [-] read out and control |
+ | * [-] cosmic measurement 200MeV; warm or cold? (23.09.) | ||
+ | * [x] build cable pocket (23.09.) | ||
+ | * [ ] VLAN commissioning (L) (24.09.) | ||
+ | * [x] test run with stapler | ||
+ | * [x] Get cabled detector ready for movement (24.09.) | ||
+ | * [x] get racks ready (25.09.) | ||
+ | * [x] get chiller ready (27.09.) | ||
Time plan in A1-hall: | Time plan in A1-hall: | ||
- | * [x] Move spectrometers (30.08.) | + | * [x] move spectrometers (30.08.) |
- | * [x] Clear stuff in A1 hall (S) (30.08.) | + | * [x] clear stuff in A1 hall (S) (30.08.) |
- | * [x] Disassemble | + | * [x] disassemble |
- | * [x] Disassemble | + | * [x] disassemble |
- | * [x] Build, install and measure target ladder | + | * [x] build, install and measure target ladder |
* [x] install new target chamber | * [x] install new target chamber | ||
- | * [ ] Build MayTech table in A1-Hall (10.09.) | + | * [x] build MayTech table in A1-Hall (10.09.) |
- | * [ ] Move calorimeter to A1-Hall | + | * [x] close target chamber and vacuum test (24.09.) |
- | * [ ] Close target chamber | + | * [x] build detector frame and adjust feet (24.09.) |
- | * [ ] Install | + | * [x] move calorimeter |
- | * [ ] Install | + | * [x] install calorimeter with exit beam pipe (25.09.) |
- | * [ ] Vacuum test of exit beampipe | + | * [x] Install infrastructure (PC, Racks, etc.) (26.09.) |
- | * [ ] Install infrastructure (PC, Racks, etc.) (04.10.) | + | * [ ] cable calorimeter on rack side (priority: signal cables and LV, then: light pulser and HV) (04.10.) |
- | * [ ] Cable calorimeter on Rack side (04.10.) | + | * [ ] install chiller and dry air (04.10.) |
- | * [ ] Test all submodules | + | * [ ] build lead wall for chiller (11.10) |
- | * [ ] Put vacuum on exit beampipe | + | * [ ] biuld holding structure for VAT valve |
- | * [ ] Cool detector (18.10.) | + | * [ ] scintillator-pmt readout with VME crate |
- | * [ ] Cosmic | + | * [ ] holding structure for PMTs |
+ | * [ ] align and measure calorimeter | ||
+ | * [ ] read out and control whole detector | ||
+ | * [ ] cool detector (07.10.) | ||
+ | * [ ] install VAT and window and flange (09.10.) | ||
+ | * [ ] vacuum test of exit beampipe ? | ||
+ | * [ ] put vacuum on exit beampipe for beamtime (14.10.) | ||
+ | * [ ] cosmic | ||
+ | * [ ] install more nests, which are visible from the sides ? | ||
- | Cooling (J): | + | Scintillators: |
- | * [ ] connect outer cooling (06.09.) | + | * [ ] find 6 scintillators with PMTs |
- | * [ ] dry air module readout via LAN (Pierre) | + | * [ ] HV with VME crate |
- | * [ ] prepare manifold boxes | + | * [ ] read out signal with VME crate (which module?) |
- | * [ ] humidity readout | + | * [ ] holding structure |
- | What else: | + | Counting room: |
- | * detector position measurement in A1 hall | + | * [ ] network |
- | * Vacuum tests | + | * [ ] server |
+ | * [ ] computers etc. | ||
+ | |||
+ | Cooling (J): | ||
+ | * [x] connect outer cooling (06.09.) | ||
+ | * [x] prepare manifold boxes | ||
+ | * [x] humidity readout (10.09.) | ||
Parts Missing: | Parts Missing: | ||
- | * temperature cables extern | + | * VAT holding structure |
- | * USBC cables for half subunits | + | * scintillators, read out by PMTs; up to six |
- | * adapter plates for table (feet, rails, etc.) | + | |
- | * " | + | |
- | * finish flange for exit beam pipe downstream | + |