beamtimes:2024:target_control
Differences
This shows you the differences between two versions of the page.
Next revision | Previous revision | ||
beamtimes:2024:target_control [2024/10/18 09:35] – created himuser | beamtimes:2024:target_control [2025/03/06 12:13] (current) – himuser | ||
---|---|---|---|
Line 1: | Line 1: | ||
+ | ===== MAMI needs optimization ===== | ||
+ | - Beam off -> ELOG entry "beam off, MAMI optimization, | ||
+ | - Change target to " | ||
+ | - Now MAMI can start the optimization -> call MAMI | ||
+ | - when the optimization is finished, normally <1h (call from MAMI): check beam position\\ | ||
+ | - change target to luminescent screen (Al203) | ||
+ | - turn on target camera | ||
+ | - turn on beam slowly (MAMI) until you see a white spot | ||
+ | - ask MAMI to center the beam | ||
+ | - take a picture | ||
+ | - turn beam off | ||
+ | - now you can move to the desired target | ||
+ | - turn beam on with the desired current -> ELOG entry "beam on, target XY, current XY" | ||
+ | |||
+ | |||
====== Target control ====== | ====== Target control ====== | ||
+ | |||
+ | ==== Change target ==== | ||
+ | - beam off | ||
+ | - move target | ||
+ | - beam on with desired current -> ELOG entry | ||
+ | |||
+ | |||
+ | |||
==== Target camera ==== | ==== Target camera ==== | ||
Line 13: | Line 36: | ||
* move target with " | * move target with " | ||
* check target position with " | * check target position with " | ||
+ | * for optimization in A1 hall: empty target | ||
List of targets and commands: | List of targets and commands: | ||
^ Target | ^ Target | ||
| empty | go_Empty | | empty | go_Empty | ||
- | | Pb nat | go_Ca40 | + | | Pb nat (124µm) |
| Plastic (Lupolen) | | Plastic (Lupolen) | ||
| Si28 | go_Si28 | | Si28 | go_Si28 | ||
- | | Pb nat | go_Pb | | + | | Pb nat (200µm) |
| luminescent screen | | luminescent screen | ||
| Ta181 | go_Ta181 | | Ta181 | go_Ta181 | ||
- | | C12 | + | | C12 |
| holy carbon | | holy carbon | ||
+ | |||
+ | == Target ladder control restart== | ||
+ | |||
+ | if target ladder is not moving, restart the target ladder control: | ||
+ | |||
+ | $ ssh root@control5 | ||
+ | $ / | ||
+ | $ exit |
beamtimes/2024/target_control.1729244158.txt.gz · Last modified: by himuser