beamtimes:2022_apr:slow_control
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
beamtimes:2022_apr:slow_control [2022/04/08 12:03] – himuser | beamtimes:2022_apr:slow_control [2022/04/21 12:02] (current) – himuser | ||
---|---|---|---|
Line 9: | Line 9: | ||
* Light Pulser 1 (Mainz) | * Light Pulser 1 (Mainz) | ||
* Light Pulser 2 (LED Matrix) | * Light Pulser 2 (LED Matrix) | ||
- | * Temperature Readout | ||
* Chiller??? | * Chiller??? | ||
+ | |||
+ | === Temperature Readout === | ||
+ | * ssh to hadanapc5 | ||
+ | * go to / | ||
+ | * make sure, vxi11 is an executable. Check with '' | ||
+ | * run '' | ||
+ | * in the script, you can adjust the '' | ||
+ | * the last measurement is always print out in the console. | ||
+ | * the data for the different protos are saved in seperate files in a directory named after a unix timestamp | ||
+ | * the time stamp is the standard unix one | ||
+ | * you can also read the temperature of the sensors without logging with '' | ||
+ | |||
Line 18: | Line 29: | ||
start server on VME PC: | start server on VME PC: | ||
* got to VME-PC '' | * got to VME-PC '' | ||
- | * '' | + | * '' |
- | * '' | + | * '' |
- | start GUI on hadanapc5: | + | open a new terminal and start the GUI on hadanapc5: |
- | * | + | * '' |
+ | * '' | ||
+ | Now the GUI window opens. | ||
+ | Channel 2 and 3 are currently used for the scintillators. | ||
+ | Set the trip current to 30 muA and set the max Voltage to 1500 V. | ||
+ | Turn up the voltage to 1300 V, now you should be able to see signals. | ||
- | == QDC == | + | === CFD === |
+ | also on VME PC: | ||
+ | * '' | ||
+ | * '' | ||
+ | * the CFD contrl reads the thresholds from the config.txt | ||
- | == Scaler == | + | === Scaler === |
+ | start Scaler on VME PC: | ||
+ | * '' | ||
+ | * '' | ||
+ | * the rate for the channels is written in '' | ||
+ | === QDC === | ||
+ | also on VME PC: | ||
+ | * '' | ||
+ | * '' | ||
+ | the QDC needs a gate to start measuring something!! | ||
beamtimes/2022_apr/slow_control.1649419381.txt.gz · Last modified: 2022/04/08 12:03 by himuser